The East Education Wing was originally built in 1961. The wing built of concrete block and brick on a concrete slab with a flat roof has served Redeemer well over the years, however it is proving to be increasingly difficult to repair and update. The plumbing has frequent leaks and a large leak in the boiler system has caused one of the classrooms and both bathrooms to be shut off from the boiler heat. Please help us rebuild for many more generations of use!
Redeemer has made plans with PBS builders to tear down and rebuild the East Wing. The estimated cost for this project is $2,000,000. The proposed date for breaking ground is in Summer of 2024.Â